0574-87309341

支招小作文 | 一写就凉凉的流程图该咋写?

作者: 2019-08-21 11:32 来源:宁波编辑
收藏

今天的主题依旧是“流程图”《剑14》里的流程图,是流程图的“集大成者”。

这个流程图同时具有两个种类的流程图的特点:既是制作/制造工序(发电)又有循环(水流是在发电厂里循环的)。

《剑14》小作文:流程图

The diagram below shows how electricity is generated in a hydroelectric power station.

Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

微信图片_20190821113100.jpg

于是,接下来的sample essay就遵循day and night and again 的 cycle 来写。


高分范文及解析

The diagram is an illustration of how a hydroelectrical power plant works to generate electricity.


开始注意:制作/制造工序类型的流程图的词汇核心在于(但不限于)动词。


The dam obstructs the influx of water from the river and creates a reservoirat a great height. At the bottom of the dam is an entry point that is open during the day and through which water flows into the tunnel, which leads to the reversible turbines, which spins. The spinning produces power that operates the electricity generator. 「独立的重要步骤不拿定语从句写,而是单独写一个句子/或者是状语从句。」At this point, electricity is produced. Electricity is then transmittedvia the power lines to the national grid and to households, manufacturersand businesses.


In addition, water goes into a low-level reservoir, and during the night, water flows inversely through the way it flows down to the intake point, which is closed at night, and back to the high-level reservoir. As a new day starts, water is let down again.


总结制作/制造工序类型的流程图的核心在于:描述简单或者复杂程度。


Overall, electricity production with hydraulic power is not a complexprocedure, with simple apparatus

更多相关方面的信息,欢迎登录宁波新航道官网进行了解。

姓名:
电话:
提交需求
  • 品牌简介
  • 精品项目
  • 课程中心
  • 线上课堂
  • 留学服务
  • 校区地址
您想学习哪门课程
    您的目标分数
      您的学习周期
      • 一个月
      • 三个月
      • 六个月
      • 六个月以上
      获取报价

      我们将在一个工作日内通知您报价结果

      热门活动

      注册/登录

      +86
      获取验证码

      登录

      +86

      收不到验证码?

      知道了

      找回密码

      +86
      获取验证码
      下一步

      重新设置密码

      为您的账号设置一个新密码

      保存新密码

      密码重置成功

      请妥善保存您的密码
      立即登录

      为了确保您的帐号安全

      请勿将帐号信息提供给他人/机构